
Laboratory Accreditation
ISO/IEC 17025:2017
Testing & Calibration Laboratories Competence
Accredited Turnaround
14-20 Business Days
Certificate Validity
3-Year Cycle with Annual Surveillance
IAF Sector Scope
ILAC / Laboratory Testing Services
Audit Governance
Dual-Desk Certified
Official Standard Scope
Audit Framework & Compliance Purpose
Scrutiny of testing methodologies, environmental controls, equipment calibration curves, and measurement uncertainty.
Person-Day Calculation: Determined by test scopes, calibration parameters, and qualified technical signatories.
Phase 01 Protocol
Mandatory Desk ReviewStage 1 Documentation Checklists
Prior to lead auditor deployment on-site, the client must submit the following verified documentation for preliminary gap analysis:
1Quality manual adhering to ISO/IEC 17025:2017 management and technical clauses
2Method validation dossiers, uncertainty budgets, and standard operating procedures (SOPs)
3Equipment calibration certificates with unbroken traceability to national metrology institutes
4Proficiency testing (PT) or inter-laboratory comparison (ILC) participation records
Phase 02 Verification
Facility Floor AuditStage 2 On-Site Audit Checkpoints
Qualified lead auditors inspect operational floors, machinery calibrations, risk registers, and worker safety practices across manufacturing and logistics facilities:
Live witnessing of representative test and calibration procedures by technical assessors
Evaluation of environmental controls (temperature, humidity, vibration) in testing areas
Interviews with authorized signatories on measurement uncertainty and error analysis
Audit of sample receipt, chain-of-custody, reporting software, and data integrity
Official Registry Issuance
Accredited Certification Deliverables
- Accredited ISO/IEC 17025:2017 Laboratory Competence Certificate
- Formal Schedule of Accreditation detailing validated test parameters and ranges
- Technical Assessor Evaluation & Measurement Uncertainty Review
Accredited Registrar Bureau
Schedule Your ISO/IEC 17025:2017 Audit
Submit facility headcounts, multi-site structures, and desired deployment dates. Preliminary gap analysis reports dispatched within 48 business hours.
SUBMIT AUDIT APPLICATIONGeneral Inquiry / Call DeskLead Auditor Deployment Hubs


